At thisThe world has always been dependent on oil as a source of energy – we use it to heat homes and fuel cars, airplanes, ships, and trains. But how do oil pipelines work?
We consume an estimated 100 million barrels of oil and 60 million barrels of natural gas daily. The problem is that there are not many oil fields in one place, and almost all oil must relocate from the source to where it’s most needed.
Oil pipelines serve as the vital connection between oil wells and end-users, transporting oil safely. They have been around the oil industry since the 1800s. The earliest examples popped up in Pennsylvania’s first commercial oil well in 1859. In the United States, currently, more than 2 million miles of pipelines carry natural gas, oil, and other hazardous liquids.
Oil Pipeline Capacity: How Much Oil Can It Carry?
The capacity of a pipeline is the total volume of oil that it can carry in one day. It varies according to the diameter and length of a pipeline. A large-diameter pipe can deliver more barrels per day than a smaller one.
As of the end of 2020, a total daily capacity of over 99 million barrels of oil equivalent was flowing through operational oil pipelines worldwide.
How Fast Does Oil Move Through Oil Pipelines?
Oil travels through a pipeline at about three to eight miles an hour, which is much slower than the speed it would travel if it were in a truck. The speed of pipeline transport results from factors like diameter, pressure, topography, and viscosity.
How Deep Are Oil Pipelines?
Most pipes exist between three and six feet below the ground. This precaution protects them from damage and keeps them out of sight.
How Does Oil Pipeline Construction Work?
The construction process requires oil pipeline tools on a massive scale. Furthermore, as with any large-scale project, there are several complex processes to keep in mind.
To begin, you have to consider selecting a route for the pipeline. It includes evaluating possible sites, determining the best trail, and addressing concerns from local communities. The route chosen will also impact the design of the pipeline, so hand tool safety is a top priority.
The construction process typically involves these steps:
Survey
A survey crew will conduct a preliminary terrain inspection to build the pipeline. This step requires attention to detail to ensure that all potential issues are public before it’s too late.
Clearing
Pipelines have to cross miles and miles of untamed land, cut through mountains, and even lay underneath rivers. The pipeline contractor will need to clear the route to building the pipeline.
Excavation
The construction company will dig a trench at specific depths and widths to accommodate different pipelines.
Pipe Stringing and Bending
After excavation, diggers will lay pipes within the trench or beside it. A pipe-bending machine uses sections of pipe bend to follow planned routes along the terrain.
Welding
Once bending completes, construction companies will weld pipe sections together and coat them with a protective layer to prevent corrosion. Quality assurance happens by inspecting the welded joints with an X-ray.
Lowering the Pipe
At this stage, the connected lengths of the pipes lower into the excavated trench.
Testing and Restoration
To ensure the pipeline’s integrity, you will need hydrostatic testing. If everything goes as it should during this test, the pipeline is operational. After this, all impacted surfaces need reseeding and restoration.
Oil pipeline jobs need tough wrenches that withstand the test of time. That’s where Lowell comes in.
How Do Pipelines Transport Oil?
The oil industry is so large and complicated. For many people, it gets hard to understand how it all works. Millions of people are beginners in understanding how oil moves in pipelines. Ever wondered how oil moves inside a pipeline? Here is how it works!
Gathering pipelines carry oil from wells to processing plants. The pipes are smaller in size and go over short distances. Feeder pipelines then transfer the oil from processing plants to transmission pipelines.
Transmission pipelines, however, carry oil from the production regions and transport it to customer markets and distribution points. They typically need bigger pipes than gathering systems and are optimal for long distances. The use of pressure boosting equipment is necessary for transmission systems. Centrifugal pumps help the oil move through pipelines utilizing rotational energy.
Common Tools for Oil Pipeline Maintenance
We use oil pipeline tools to install pipelines in the ground. They come in different shapes and sizes. These tools need to be durable because they face exposure to harsh environments. Examples include maintenance hole hooks, sledgehammers, gas monitors, and wrenches.
A wrench uses a mechanical advantage to fasten, turn, tighten, and lose objects. Nearly every sector of the oil and gas industry uses this tool, including drilling, refining, and pipeline operations. Examples include the valve wheel wrench, the valve handle wrench, and the strap wrench.
Oil pipeline tools help install pipes and are useful in completing construction or maintenance projects effortlessly. Having the right tools can help you strike a balance between cost and efficiency to maximize your productivity and make the whole process of oil pipeline construction easier and faster.
Another benefit is that the right tools tend to be very useful for laying pipes at difficult angles or slopes. The pipe installation tools help install valves, fittings, and other pipeline components.
For more information about Lowell wrench sets, call (800) 456-9355 or email customerservice@lowellcorp.com. You can also follow us on Instagram for exciting updates on future products.
The Risks of Oil Pipeline Construction
Oil pipeline construction is fraught with risks. The most obvious is a leak or spill, which contaminates the environment and causes damage to wildlife. In addition, they increase the risk of fire, which can cause a lot of environmental damage if not dealt with properly. However, there are also risks with the construction process, such as dangerous chemicals that can harm wildlife.
When it comes to associated risks, the oil pipeline industry has faced several accidents over the years. To minimize these risks, many companies have adopted new safety measures. These measures include leak detection systems and emergency response plans to protect people and the environment.
One method of protecting pipelines from leaks is by using CPM. Computational Pipeline Monitoring allows for early detection of those leaks and helps mitigate their consequences.
Ready to save time and money on
your pipeline tools?
The Best Oil Pipeline Tools Since 1869
Lowell Corporation offers the best hand tools in the oil drilling industry. Whether you need a valve wheel wrench, valve handle wrench, or strap wrench, you’ll want the right balance between cost and efficiency. Our custom-made hand tools make tough jobs easier for oil pipeline construction. We’ve’ been increasing productivity in construction, maintenance, and manufacturing operations since 1869. So let our waterworks pipeline tools simplify your workload. With our essential pipeline and construction hand tools, you get the backing of the most trusted name in the hand tool industry.
Above all, Lowell Corporation is proud to manufacture all of its waterworks tools right here in the U.S.A. in the heart of New England. All Lowell wrenches are 100% guaranteed with our one-year manufacturer warranty against defects in material and craft for one year from the date of delivery.
Make sure to follow us on Instagram for exciting product updates and promotions!